About the CALEA 2 project

The Project comprises the development, construction and operation of a 60 MW Solar PV Plant in Pielesti and Robanesti communes, Dolj county, southern Romania.

The PV Plant Project is located approximately 20 km east of Craiova City, the main urban centre in the area and covers a site splitted in two smaller areas: the “northern” Project area located in Pielesti commune and the “southern” Project area located in Robanesti commune.

The grid connection line follows a route along an existing dirt road between agricultural plots. The underground line connecting the two PV plant areas follows a route along National Road 65.

The PV plant is located on privately owned agricultural land plots with a total area of 712,455 m2.

 

Maximum installed/connection power 60 MW (DC) / 49.7 MW (AC)
Specific production ~ 1 430 MWh/MWp/year
Energy production (30 years)2  ~ 2 390 000 MWh
Connection directly to the grid 110 kV using own substation
Expected operational date 2025
Location South of Romania, Dolj county, Pielesti village

Project’s owner is Romanian company Danube Solar Five SRL.

A construction engineering and project management company is EPCM10 SRL,  commissioned for the management of the Project construction on the Project Developer’s behalf.

Project’s Engineering, Procurement and Construction (EPC) company is AJ Renewables SRL.